by seanarmadillo » Sun Oct 22, 2006 9:40 pm
i built a constuction crane that moves into position and drops the bridge section inplace for the armadillo just in time!! IT USES NO TIMERS EITHER
- Attachments
-
- Crone Docks.lvl
- This is and adaptations of the crane
- (8.37 KiB) Downloaded 343 times
-
- Construction Crane.lvl
- (9.68 KiB) Downloaded 346 times
Last edited by
seanarmadillo on Sun Oct 22, 2006 11:35 pm, edited 1 time in total.