Many thanks Ion and Mark.
Yup - that was the sort of thing I had in mind.
But, I knew I needed a proper 'lift' - I just couldn't build it.
(Mark's and Rob's solutions include them I believe)
AND my welding needs some adjustment - I'm leaving gaps all over the place which make things a bit 'floppy'.
I failed on this level because -
If I added more 'counter'-weight then the Dillo would fall out at the top,
Or the structure would break
Or if I tried to LOWER the catcher (or reduce counter-weight) then ..
The Dillo wouldn't get there at all,
Would get there too low,
Would fall out the catcher before it moved
That was a great level for B League and I enjoyed watching, and hopefully learning from, the POCs.
(And the adjustments you guys demonstrated)
Cheers, Dave.